Karnataka. Department of Electrical & Electronics Engineering. Power System Simulation Lab. Lab Manual. 10EEL B.E – VII Semester. Lab Manual EE Power System Simulation Lab Manual EEE seventh semester. July 23, at AM ยท CLICK HERE TO VIEW ONLINE CLICK HERE TO. EE – POWER SYSTEM STIMULATION LAB MANUAL . ME COMPUTER AIDED SIMULATION & ANALYSIS LABORATORY.

Author: Tauk Tazil
Country: Antigua & Barbuda
Language: English (Spanish)
Genre: Education
Published (Last): 24 August 2006
Pages: 46
PDF File Size: 6.65 Mb
ePub File Size: 1.8 Mb
ISBN: 840-5-97016-119-1
Downloads: 70149
Price: Free* [*Free Regsitration Required]
Uploader: Fegore

Sri Sep – Nov Sr. This is simulated by removing the kth row and column from the pre-fault bus admittance matrix.

Power System Simulation Laboratory Manual

Veeraraghavan 2 Regular Lecturer M. Quantity required 1 each 1 No. Is performance appraisal system followed for faculty members?

Govindan Sri Muthukumaran Prof. Find inductance per phase and capacitance if the radius of each sub conductor is 1. Programmes for which affiliation is sought for the year Inspection fee per programme Number of programme s Total Amount Rs 1. Chemistry Unit Manger 7 yrs. Usually, the solution is carried out for two swings to show that the second swing is not greater than the first one. Hostels Distance between the location of the college and the city: Fax numbers Mobile numbers e-mail Sri Muthukumaran Educational: For voltage controlled buses, Pi p and Pi p are computed.

  HTML2PS BLANK PDF

Thus the various aspects of transient and small signal stability analysis of single machine infinite bus system were made familiar. Discipline and Welfare committee ii.

If yes, phase out the academic year academic year for how many programme? Determine the critical clearing angle. Share to Twitter Share to Facebook.

Sysgem Technology Lab List of equipment required for a batch of 30 students for U. The classical transient stability study is based on the application of a three phase fault. Rajesh Lecturer Lecturer 2 yrs – 64 iii.

Tolstoy 11 Sugumaran 10 12 Mrs. Computation of Parameters and Modeling of Transmission Lines 2.

Sri Muthukumaran Institute of Technology

Arulmurugan 95 96 Calculate the change in reactive power for load bus or for the Generator bus treated as load bus. The models of equipments must be detailed enough to reproduce actual conditions successfully an important aspect where a general purpose digital computer program scores over transient network analyzers. If the calculated reactive power is within the specified limits then consider this bus as Generator bus.

  C2611 TRANSISTOR PDF

Meaningful use of EHV is dependent on modeling philosophy built into a computer program. Thus the line modeling of different types of transmission lines was done. Carey Foster Bridge 5 Nos.

EE Power System Simulation Lab Manual

Certificates The originals of the following are to be produced for verification at the time of inspection to the inspection committee members copies need not be enclosed along with application Sl. Multi user Multi user 5 Nos.

Jeyalakshmi 1 Year 2. Ajmer Institute of Technology.

Calculate the value of Existing affiliated programmes A. Read the number of buses, starting bus and ending bus. The new bus admittance matrix is reduced by eliminating all nodes except the internal generator nodes. Pon Kavitha Mani Regular M. The Director of Simluation.